A hyperscale-specific design and the only data center in Switzerland powered by separate power generating sources, ZUR01A delivers hyper-redundancy from grid to data hall. The facility is unique in Switzerland in its ability to provide four data hall configurations, in terms of power and size, to allow hyperscalers and cloud providers to deploy their standardized densities and layouts.

SCHEDULE A TOUR

COMPLIANCE
  • ISO 9001
  • ISO 14001
  • ISO 27001
  • ISO 45001
  • ISO 50001
  • ISAE 3402
  • PCI/DSS Compliant
2 Million +
4,600 SQM
power
10 MW
CAPACITY & AMENITIES
POWER & RELIABILITY
COOLING & EFFICIENCY
CONNECTIVITY
SAFETY & SECURITY
Fire Protection
TOTAL CAPACITY

10 MW IT LOAD

FACILITY SIZE

4,600 SQM WHITE SPACE

Deployments

POWERSTACK™: Immediately available shell capacity

WORK SPACE

Conference rooms and break rooms

WiFi

Complimentary WiFi

Office

Shared and dedicated office space

Storage

Shared and private storage

CLIENT CONVENIENCES

On-site showers, cafeteria

Bike Storage

Yes

Parking

On-site parking & EV charging

Staging area

Yes

Generators

13 Gen – 2250 kVA each

Electrical redundancy UPS

3 out of 4 distributed redundant power systems

16 No. UPS

Each UPS circa 1MVA

5 x 200kW modules

Utilities

Dual power feed 20 MVA

Fuel Storage

N+1 circuits, pumps, tanks (daily, main) with 48 hours of autonomy

Mechanical

IACs for Data Hall cooling: N+1

Density

2.5 kW/sqm

BMS Controls

Yes

Hardened Exterior

Exterior walls steel reinforced poured concrete; ground pilings

Flood Plain

Above 100 year flooding area

Cooling

IACs for Data Hall cooling: N+1 – Hot Aisle Containment

Chiller

Cooling equipment with compressors, free-cooling and aero-adiabatic for ancillary

Water Storage

480 cubic meters

Electrical

UPS Distributed redundancy (4 to make 3) – XYZ for Telco requirements. UPS efficiency > 96%

Free Cooling

Yes – In operation when T° is < 15°C

Diversity

2 Meet-Me-Rooms with 2 fiber entrances

Carrier Availability

Carrier neutral facility

Cloud Access

Available on request

Roof Space

Available

Access

Secure vehicle & pedestrian gates with proximity badge reader

Loading Dock

2 secured Loading Docks

Fencing

Secure perimeter fencing + radar detection around the building

Security

Dual factor authentication – biometric access

Roof

Available for satellite dish

Detection

Vesda

Suppression

Sprinkler system (DH, loading and storage)

ZUR02


ZUR02


With 50MW diverse feeds and permitting approved, the ZUR02 campus is the only major capacity available to support the growth of cloud in Switzerland. It is ideally located to provide expansion capacity in a country where securing land and power is challenging, and can provide a competitive edge to either cloud providers or other large deployments that are facing capacity restraints in the region.

SCHEDULE A TOUR

CAPACITY & AMENITIES
POWER & RELIABILITY
COOLING & EFFICIENCY
CONNECTIVITY
SAFETY & SECURITY
Fire Protection
TOTAL CAPACITY

36 MW IT LOAD

FACILITY SIZE

12,000 SQM (12x1k SQM) WHITE SPACE

Deployments

HYPERSTACK™: Build-to-Suit

WORK SPACE

Conference rooms and break rooms

WiFi

Complimentary WiFi

Office

Shared and dedicated office space

Storage

Shared and private storage

CLIENT CONVENIENCES

On-site showers, cafeteria

Bike Storage

Yes

Parking

On-site parking & EV charging

Staging area

Yes

Generators

21 Generators x 3.6 MVA
N+1 Configuration

Electrical redundancy UPS

Isolated redundant configuration

6 primary critical system from a dedicated 2.4MW double-conversion static UPS with 5 minutes lithium-ion battery autonomy

1 reserve critical system can support the load of any single PCS under failure or maintenance conditions

Utilities

Dual utility incoming supplies

Fuel Storage

Fuel storage will be provided with 48 hours autonomy, through a combination of bulk and day tank fuel storage

Mechanical

N+1 Critical cooling Installation, hybrid heat rejection units and Air-Cooled Chillers for trim cooling

Density

2.5 kW/SQM

BMS Controls

Yes

Hardened Exterior

Concrete construction

Flood Plain

The site is not in a flood hazard area

Cooling

3 No. primary cooling circuits, each consisting of 7 No. hybrid adiabatic/dry air-cooling systems

Chiller

Air-Cooled Chillers will comprise multiple turbo core compressors

Water Storage

Thermal storage as part of the primary chilled water infrastructure

Electrical

UPS efficiency > 96%

Roof Space

Available for Satellite dish

Access

Secure vehicle & pedestrian gates with proximity badge reader

Loading Dock

2 secured Loading Docks

Fencing

Secure perimeter fencing + radar detection around the building

Security

Dual factor authentication – biometric access

Roof

Available for Photovoltaic pannels (1700 SQM) + Satellite dish

Detection

Multifunction smoke detection and VESDA

Suppression

Pre-action double interlock water mist / sprinkler