Tokyo
Japan – one of the largest, most competitive markets in Asia Pacific – is now in STACK Infrastructure’s portfolio, launching a deep commitment to future investments into the APAC region. STACK’s two-building, 36MW campus is located in Inzai, an area of Tokyo that has seen significant hyperscale data center growth. Connected to a regional substation powered by Tokyo Electric Power Company, the facility will offer hyperscalers and enterprises on-demand critical capacity with scalability and redundancy in one of the fastest-growing digital markets.
TKY01
TKY01 Data Center
TKY01 Data Center
Each building will have 18MW of critical capacity with the first installation offering both READYSTACK and POWERSTACK. With options for expansion, the facilities are designed to enable higher rack density and floor loading specifications, reflecting the evolving requirements in Inzai and APAC. In addition, STACK’s Inzai campus will feature an ideal security layout with separate access points and applicable separation of services.

COMPLIANCE
ISO 27001
SOC 70
after commencement of operations
SOLUTIONS

TKY01 CAMPUS SIZE
2.3 hectares (6 acres)
TOTAL CAPACITY
36MW Total Campus Capacity
6MW READYSTACK
12MW POWERSTACK
18MW HYPERSTACK
WORK SPACE
Conference and break rooms
Complimentary Wi-Fi
Shared and dedicated office space
STORAGE
Shared and private storage/staging
CLIENT CONVENIENCES
Access to rail
Showers
Bicycle storage
Vehicle Parking
Multi-bay secure loading docks
20 foot container capabilities
5 ton, 3 ton and 1.6 ton elevators
Restaurants and shops nearby.
TOKYO ELECTRIC POWER COMPANY
Dual 66kv extra high voltage lines
ELECTRICAL REDUNDANCY (GENERATORS / UPS)
N+1 Block Redundant
FUEL STORAGE
Minimum 24 hours of operation
PDU
Client-dedicated PDU distribution
BMS CONTROLS
Client access to BMS portal
SECURITY
24 x 7 on-site security personnel
Dual-factor biometric access
CCTV coverage with 93-day retention
Secure vehicle gates with badge access
Perimeter fencing
Tenant specific security,
Separate Yellow and Red Zone access elevators
FIRE PROTECTION
Dual smoke detection including VESDA/HSSD
Clean Agent Gas fire suppression in Data Halls and Electrical Rooms
Located in a FEMA-designated area of minimal flood hazard
COOLING
N+2 air-cooled chillers
FLOOR LOADING
20kN/m2 in data halls and access route floors
ANNUALIZED PUE TARGET 1.30
Seismic isolation, PML below 3.6%
Potential for 18MW dedicated building with dedicated access
Tenant’s choice of security system
M&E design allows separation of plant from private data halls