TKY01

TKY01 Data Center


TKY01 Data Center


Each building will have 18MW of critical capacity with the first installation offering both READYSTACK and POWERSTACK. With options for expansion, the facilities are designed to enable higher rack density and floor loading specifications, reflecting the evolving requirements in Inzai and APAC. In addition, STACK’s Inzai campus will feature an ideal security layout with separate access points and applicable separation of services.

SCHEDULE A TOUR

CAPACITY & AMENITIES
POWER & RELIABILITY
SAFETY & SECURITY
COOLING & EFFICIENCY
CONSTRUCTION
TKY01 CAMPUS SIZE

2.3 hectares (6 acres)

TOTAL CAPACITY

36MW Total Campus Capacity

6MW READYSTACK

12MW POWERSTACK

18MW HYPERSTACK

WORK SPACE

Conference and break rooms

Complimentary Wi-Fi

Shared and dedicated office space

STORAGE

 Shared and private storage/staging

CLIENT CONVENIENCES

Access to rail 

Showers

Bicycle storage

Vehicle Parking

Multi-bay secure loading docks

20 foot container capabilities

5 ton, 3 ton and 1.6 ton elevators

Restaurants and shops nearby.

TOKYO ELECTRIC POWER COMPANY

Dual 66kv extra high voltage lines

ELECTRICAL REDUNDANCY (GENERATORS / UPS)

N+1 Block Redundant

FUEL STORAGE

Minimum 24 hours of operation

 

 

PDU

Client-dedicated PDU distribution

BMS CONTROLS

Client access to BMS portal

SECURITY

24 x 7 on-site security personnel 

Dual-factor biometric access

CCTV coverage with 93-day retention

Secure vehicle gates with badge access

Perimeter fencing

Tenant specific security,

Separate Yellow and Red Zone access elevators

FIRE PROTECTION

Dual smoke detection including VESDA/HSSD

Clean Agent Gas fire suppression in Data Halls and Electrical Rooms

Located in a FEMA-designated area of minimal flood hazard

COOLING

N+2 air-cooled chillers

FLOOR LOADING

20kN/m2 in data halls and access route floors

ANNUALIZED PUE TARGET 1.30

Seismic isolation, PML below 3.6%

Potential for 18MW dedicated building with dedicated access

Tenant’s choice of security system

M&E design allows separation of plant from private data halls