The STO01 campus is located in Upplands Väsby, a communications center for the northern suburbs of Stockholm. The location enables carrier neutral high speed connectivity. The unique combination of ample connectivity, significant expansion capacity, and state-of-the-art technical solutions ensures the Stockholm site is truly exceptional and sets a new standard for scalable colocation.

2 Million +
6,000 SQMcurrent campus
power
16 MW
CAPACITY
Current Capacity

16MW

Expansion Capacity

48MW

Future Campus Size

24,000 SQM 

STO01A

  • STO01A
  • STOL1

STO01A

  • STO01A
  • STOL1

STACK Stockholm 01 is a highly connected and secure colocation data center at our Stockholm Campus. It is powered by 100% renewable energy and is very energy efficient. The data center offers secure and sustainable solutions with capacity for extensive scalability and growth.

The data center currently offers 6,000m² of white space, for both READYSTACK and POWERSTACK solutions. There are further buildings planned within the campus.

COMPLIANCE
  • ISO 9001:2015 Quality Management
  • ISO 14001:2015 Quality Management Environmental
  • ISO 27001:2013 Information Security Management System
  • ISO 45001:2018 Occupational Health & Safety Management
  • PCI/DSS
  • LOS Energy Sweden 100% Renewable Energy Guarantee
  • ISAE 3402 / SOC 1 Report
2 Million +
6,000 sqm
power
16 MW
CAPACITY & AMENITIES
POWER & RELIABILITY
COOLING & EFFICIENCY
CONNECTIVITY
SAFETY & SECURITY
Total Capacity

16MW

Facility Size

6,000 sqm

Deployments

READYSTACK™: Commissioned capacity

POWERSTACK™: Immediately available shell capacity

Work Space

Conference and break rooms

Complimentary WiFi

Office space available

Storage

Shared and private storage/staging

Client Conveniences

Showers

Car parking

Bicycle storage

Multi-bay secure loading dock

Utility and Power Sources

2N 16 MVA medium voltage supply available

Generators

N+1 redundancy

Fuel Storage

Upto 48 hours of fuel operation

UPS

N+1 UPS configuration

PDU

2N PDU distribution

BMS Controls

Client access to BMS portal

Cooling

N+1 chilled water system per 1,000 sqm
Indirect evaporative cooling

Density

High density deployments supported in excess of 25 kW per cabinet

Diversity

2 Meet-Me-Rooms with diverse fiber entrances

Carrier Availability

20+ carriers

Dark fiber available

Additional Connectivity

Carrier neutral

Security

High grade boundary fencing with dual perimeter and sterile zones

24 x 7 on-site security personnel

Man trap intruder detection

CCTV coverage

Car trap with badge access

Fire Protection

Argonite fire suppressions system in conditioned modules

High grade very early smore detection apparatus

Dual-interlock pre-action sprinkler system

STOL1

  • STO01A
  • STOL1

STOL1

  • STO01A
  • STOL1

Adjacent to the existing operational data center (STO01), STOL1 includes greenfield land of 30,000 sqm for additional data center facilities to be built. The campus is close to the city, well-connected, and has a strong financial ecosystem.

 

We’ve updated our privacy policy. Please take a moment to review these changes. By clicking Accept Terms, you agree to STACK Infrastructure’s Privacy Policy and Terms of Use.