NVA01 Data Center


NVA01 Data Center


Our NVA01 facility in the heart of Ashburn offers exceptional levels of resiliency, redundancy, and security for your most mission-critical workloads.

SCHEDULE A TOUR

COMPLIANCE
  • Uptime M&O certification
  • HIPAA/HITECH
  • PCI/DSS
  • SSAE 18
  • ISO 27001
2 Million +
180,000 SQ. FT.
power
17 MW
Uptime Institute Approved
Uptime Institute Approved
CAPACITY & AMENITIES
POWER & RELIABILITY
COOLING & EFFICIENCY
CONNECTIVITY
SAFETY & SECURITY
TOTAL CAPACITY

18MW

FACILITY SIZE

180,000 SQ FT

DEPLOYMENTS

POWERSTACK™: Immediately available shell capacity

WORK SPACE

Conference and break rooms

Complimentary WiFi

Shared and dedicated office space

STORAGE

Shared and private storage/staging

CLIENT CONVENIENCES

Showers

Bicycle storage

Multi-bay secure loading dock

Diverse Utility and Power Sources

Multiple utility feeds

Served by Dominion Energy 

Fuel Storage

Minimum 48 hours of operation

Generators 

N+2 redundancy

UPS

N+1 UPS configuration

PDU

2N PDU distribution

BMS Controls

Client access to BMS portal

Building Hardening

221 mph wind-rated structure (EF5)

Flood Plain

Above 500-year flood plain

Cooling

N+1 chilled water system

N+2 CRAH units

Efficiency

Waterside economization

Storage 

72+ hours chilled water storage

Density

High density deployments supported in excess of 25 kW per cabinet

Diversity

2 Meet-Me-Rooms with diverse fiber entrances

Carrier Availability

Multiple carriers

Carrier neutral

Dark fiber available 

Additional Connectivity

Antenna space available

Security

Dual-factor biometric access

24 x 7 on-site security personnel

CCTV coverage with 93-day retention

Secure vehicle gates with badge access

Perimeter fencing

Fire Protection 

VESDA smoke detection system

Dual-interlock pre-action sprinkler system

NVAL1

  • NVA02/03/09
  • NVA04/14

NVAL1

  • NVA02/03/09
  • NVA04/14

STACK’s Prince William County campus NVAL1 will be home to at least seven data centers and provide 250MW for incredible scalability. A dedicated onsite 300MW substation will supply committed and scalable power from Northern Virginia Electric Cooperative (NOVEC) at low cost with high reliability.

SCHEDULE A TOUR

CAPACITY & AMENITIES
POWER & RELIABILITY
COOLING & EFFICIENCY
CONNECTIVITY
SAFETY & SECURITY
Campus Capacity

250MW

Campus Size

1,800,000 SQ FT

Deployments

POWERSTACK™: Immediately available shell capacity

READYSTACK™: RackReady® data halls

HYPERSTACK™: Build-to-suit

Workspace

Conference and break rooms

Complimentary WiFi

Ample shared and dedicated office space

Storage

Shared and private storage/staging

Client Conveniences

Electric Vehicle (EV) parking spaces

Showers

Bicycle storage

Multi-bay secure loading dock

Utility Service

Multiple utility feeds

Fuel

100% Renewable Energy

Substation

300MW dedicated onsite substation from Northern Virginia Electric Cooperative (NOVEC)

Electrical Redundancy (Generators / UPS)

N+1 Block Redundant

Fuel Storage

Minimum 24 hours of operation

PDU

Client-dedicated PDU distribution

BMS Controls

Client access to BMS portal

Cooling

N+1 345-ton air-cooled chillers per lineup with VSD and quick restart

Density

Deployments supported in excess of 8kW per cabinet

Diversity

Each building has a minimum of 2 Meet-Me-Rooms with diverse fiber entrances

Carrier Availability

Access to 10 networks

Dark fiber available

Security

24 x 7 on-site security personnel

Dual-factor biometric access

CCTV coverage with 93-day retention

Secure vehicle gates with badge access

Perimeter fencing

Fire Protection

Dual smoke detection including VESDA

Dual-interlock pre-action sprinkler system

NVA02/03/09 Data Centers

  • NVA02/03/09
  • NVA04/14

NVA02/03/09 Data Centers

  • NVA02/03/09
  • NVA04/14

NVA02, NVA03, NVA09 are data centers located in Prince William County and adjacent to a massive 300MW substation.

map
470,000 SQ FT
power
82 MW

NVA04/14 Data Center

  • NVA02/03/09
  • NVA04/14

NVA04/14 Data Center

  • NVA02/03/09
  • NVA04/14

NVA04 and NVA14 are located in Prince William County and adjacent to a massive 300MW substation.

2 Million +
550,000 SQ FT
power
72 MW

NVAL2


NVAL2


Centrally located in the power and land-constrained, and highly valuable, Northern Virginia market, this campus spans 80 acres with plans for three buildings featuring high-capacity dark fiber and access to all major long haul fiber carriers. Carve out a place for sustainable growth and resiliency in Data Center Alley.

SCHEDULE A TOUR

NVAL3

  • NVA13
  • Building 2

NVAL3

  • NVA13
  • Building 2

A 34-acre development near Manassas brings 84MW of critical capacity to this highly sought-after market. Utilizing STACK’s efficient Basis of Design, this campus offers a combined total of 336,000 sq. ft. of data hall space. NVAL3 is located directly adjacent to existing high-voltage transmission lines connected to a Novec substation, which will be expanded to support the site. Plentiful fiber offers fast connectivity and robust options to support growing needs of hyperscalers and large enterprises.

SCHEDULE A TOUR

map
34 acres
power
84 MW
2 Million +
602,000 SQ FT
CAMPUS

NVA13

  • NVA13
  • Building 2

NVA13

  • NVA13
  • Building 2

This first phase of NVAL3 development provides 36MW of powered shell and commissioned capacity within its 262,000 sq. ft. building for flexible options. STACK’s Basis of Design features energy efficient equipment, low-water use operations, and 100% renewable energy. Scheduled to deliver in Q3 of 2023, NVA13 supplies speed at scale to one of North America’s most constrained markets.

SCHEDULE A TOUR

Building 2

  • NVA13
  • Building 2

Building 2

  • NVA13
  • Building 2

The second phase of NVAL3 takes optionality one step further with 48MW of a HYPERSTACK build-to-suit opportunity, providing control for hyperscalers and large enterprises looking to customize facilities to meet their needs.

SCHEDULE A TOUR

READY TO TALK TO
A STACK EXPERT?

We’ve updated our privacy policy. Please take a moment to review these changes. By clicking Accept Terms, you agree to STACK Infrastructure’s Privacy Policy and Terms of Use.