ATLANTA
Find your next data center capacity in this emerging, southeastern hub close to the Fortune 500 and all the key markets in the Mid-Atlantic and South.
ATL01
ATL02
ATLL1
ATL01 Data Center
ATL01 Data Center
Located in Alpharetta, a growing technology hub, this 7MW facility boasts close proximity to several major Fortune 500 companies in Atlanta. Power is supplied by Georgia Power, the region’s highly reliable energy partner.
COMPLIANCE
- Uptime M&O certification
- LEED certification
- HIPAA/HITECH
- PCI/DSS
- SSAE 18
- ISO 27001
Solutions



TOTAL CAPACITY
7MW
FACILITY SIZE
105,000 SQ FT
Deployments
READYSTACK™: Commissioned capacity
WORK SPACE
Conference and break rooms
Complimentary WiFi
Office space available
Storage
Shared and private storage/staging
CLIENT CONVENIENCES
Showers
Multi-bay secure loading dock
Diverse Utility and Power Sources
Served by Georgia Power substations
Diverse and redundant utility feeds
Generators
N+1 redundancy
Storage
Minimum 48 hours of operation
UPS
N+1 UPS Configuration
PDU
2N PDU distribution
BMS Controls
Client access to BMS portal
Building Hardening
Double T concrete, 185 mph wind-rated structure (EF4)
Flood Plain
Above 500-year flood plain
Cooling
N+1 chilled water system
N+2 CRAH units
Efficiency
Waterside economization
Storage
8-hour condenser water storage
Density
High density deployments supported in excess of 25 kW per cabinet
Diversity
2 Meet-Me-Rooms with diverse fiber entrances
Carrier Availability
9 carriers
Carrier neutral
Dark fiber available
Additional Connectivity
Roof space available
Security
24×7 on-site security personnel
Dual-factor authentication and biometric access
CCTV coverage with 93-day retention
Secure vehicle gates with badge access
Perimeter fencing
Fire Protection
VESDA smoke detection system
Dual-interlock pre-action sprinkler system
ATL02 Data Center
ATL02 Data Center
Directly adjacent to ATL01, ATL02 offers the same robust connectivity and power optionality for enterprises looking for reliable, fast, growth opportunities.
Facility (rendering right) can be delivered in 12 months.

Compliance
- HIPAA/HITECH
- PCI/DSS
- SSAE 18
- ISO 27001


TOTAL Capacity
12 MW
Facility Size
133,000 SQ FT
Deployments
HYPERSTACK™: Campus & Build-to-suit
POWERSTACK™: Available shell capacity
Work Space
Conference and break rooms
Complimentary WiFi
Shared and dedicated office space
STORAGE
Shared and private storage/ staging
Client Conveniences
Showers
Bicycle storage
Multi-bay secure loading dock
Diverse Utility and Power Sources
Diverse utility feeds
Served by Georgia Power
Generators
N+1 redundancy
Fuel Storage
Minimum 24 hours of operation
UPS
N+1 UPS configuration
PDU
2N PDU distribution
BMS Controls
Client access to BMS portal
Building Hardening
Double T concrete roof
115 mph wind-rated structure (EF4)
Flood Plain
Above 500-year flood plain
Cooling
N+1 chilled water system
N+2 CRAH units
Efficiency
Waterside economization
PUE 1.3 or better
Storage
Thermal storage with continuous cooling
Density
7-8 kW/rack
250-300 w/sf
High-density deployments supported in excess of 25 kW per cabinet
Diversity
2 Meet-Me-Rooms with diverse fiber entrances
Carrier Availability
9 carriers
Carrier-neutral
Dark fiber available
Additional Connectivity
Antenna space available
Security
24×7 on-site security personnel
Dual-factor biometric access
CCTV coverage with 93-day retention
Secure vehicle gates with badge access
Perimeter fencing
Fire Protection
VESDA smoke detection system
Dual-interlock pre-action sprinkler system
ATLL1 Available Land
ATLL1 Available Land
Located in Lithia Springs, ATLL1 offers expansive build-to-suit capacity opportunities stretched across 39 acres and supported by plentiful power and fiber connectivity.

SOLUTIONS


READY TO TALK TO
A STACK EXPERT?
We’ve updated our privacy policy. Please take a moment to review these changes. By clicking Accept Terms, you agree to STACK Infrastructure’s Privacy Policy and Terms of Use.